M70 motorway (Hungary)

The M70 motorway (Hungarian: M70-es autópálya) is an motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia. The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019 (see the Hungarian article for references in Hungarian). It was built by the Colas Group.

M70 motorway (Hungary)

The M70 motorway (Hungarian: M70-es autópálya) is an motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia. The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019 (see the Hungarian article for references in Hungarian). It was built by the Colas Group.