Nickajack Dam
Nickajack Dam is a hydroelectric dam in Marion County in the U.S. state of Tennessee. It is one of nine dams on the Tennessee River owned and operated by the Tennessee Valley Authority, which built the dam in the mid-1960s to replace the outdated Hales Bar Dam 6 miles (9.7 km) upstream. The dam impounds the 10,370-acre (4,200 ha) Nickajack Lake and feeds into Guntersville Lake. Nickajack Dam is named for a Cherokee village once located just upstream from the dam (the site is now submerged). The village was the namesake for Nickajack Cave, which was partially flooded by the reservoir.
Wikipage redirect
2011 Super OutbreakCaecidotea nickajackensisDade_County,_GeorgiaInterstate_24Interstate 24 BridgeList of crossings of the Tennessee RiverList of dams and reservoirs in the United StatesList of dams and reservoirs of the Tennessee RiverList of power stations in TennesseeList of power stations operated by the Tennessee Valley AuthorityMarion_County,_TennesseeNew_Hope,_TennesseeNickajack Dam, TennesseeTennessee-Georgia water disputeTennessee Valley AuthorityU.S._Route_72
Link from a Wikipage to another Wikipage
primaryTopic
Nickajack Dam
Nickajack Dam is a hydroelectric dam in Marion County in the U.S. state of Tennessee. It is one of nine dams on the Tennessee River owned and operated by the Tennessee Valley Authority, which built the dam in the mid-1960s to replace the outdated Hales Bar Dam 6 miles (9.7 km) upstream. The dam impounds the 10,370-acre (4,200 ha) Nickajack Lake and feeds into Guntersville Lake. Nickajack Dam is named for a Cherokee village once located just upstream from the dam (the site is now submerged). The village was the namesake for Nickajack Cave, which was partially flooded by the reservoir.
length (km)
has abstract
Nickajack Dam is a hydroelectr ...... ally flooded by the reservoir.
@en
ГЕС Нікаджек (англ. Nickajack ...... є розміри камери 183х34 метри.
@uk
building start date
April 1, 1964
building start year
height (μ)
2.46888e+1
vastest lake
length (μ)
1.1481816e+3
location
opening date
1967-12-14
opening year
operator
part
Link from a Wikipage to an external page
Wikipage page ID
page length (characters) of wiki page
Wikipage revision ID
1,018,567,377
Link from a Wikipage to another Wikipage
construction began
1964-04-01
image caption
Nickajack Dam looking upstream
@en
Location
Marion County, Tennessee, United States
@en
name
Nickajack Dam
@en
name official
Nickajack Dam
@en
opening
1967-12-14
operator
wikiPageUsesTemplate
subject
hypernym
sameAs
point
35.00416666666667 -85.61944444444444
comment
Nickajack Dam is a hydroelectr ...... ally flooded by the reservoir.
@en
ГЕС Нікаджек (англ. Nickajack ...... є розміри камери 183х34 метри.
@uk
label
Nickajack Dam
@en
ГЕС Нікаджек
@uk
lat
3.500416666666667e+1
long
-8.561944444444444e+1
wasDerivedFrom
isPrimaryTopicOf
name
Nickajack Dam
@en