Nuremberg–Roth railway
The Nuremberg–Roth railway is a 25.5-kilometre (15.8 mi) long main line railway in the German state of Bavaria, running from Nuremberg via Schwabach to Roth. It was built parallel with the Nuremberg–Augsburg railway during the first construction phase of the Nuremberg S-Bahn and opened on 9 June 2001.
Wikipage redirect
primaryTopic
Nuremberg–Roth railway
The Nuremberg–Roth railway is a 25.5-kilometre (15.8 mi) long main line railway in the German state of Bavaria, running from Nuremberg via Schwabach to Roth. It was built parallel with the Nuremberg–Augsburg railway during the first construction phase of the Nuremberg S-Bahn and opened on 9 June 2001.
has abstract
The Nuremberg–Roth railway is ...... ahn and opened on 9 June 2001.
@en
line length (μ)
location
speed limit (kmh)
Wikipage page ID
39,221,936
page length (characters) of wiki page
Wikipage revision ID
998,066,632
Link from a Wikipage to another Wikipage
electrification
linelength km
linenumber
locale
Bavaria, Germany
@en
map state
collapsed
@en
name
Nuremberg Hbf – Roth
@en
routenumber
speed km/h
tracks
*2: Nürnberg-Eibach –Nürnberg- ...... zhembach
*2: Büchenbach –Roth
@en
wikiPageUsesTemplate
subject
type
comment
The Nuremberg–Roth railway is ...... ahn and opened on 9 June 2001.
@en
label
Bahnstrecke Nürnberg–Roth
@de
Nuremberg–Roth railway
@en
wasDerivedFrom
isPrimaryTopicOf
name
Nuremberg Hbf – Roth
@en