Renewables Obligation (United Kingdom)
The Renewables Obligation (RO) is designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. It was introduced in England and Wales and in a different form (the Renewables Obligation (Scotland)) in Scotland in April 2002 and in Northern Ireland in April 2005, replacing the Non-Fossil Fuel Obligation which operated from 1990.
Didcot power stations
Drax Power Station
Glanford Power Station
Hockerton Housing Project
Race Bank wind farm
CRC Energy Efficiency SchemeClimate Change Agreement (UK)Climate Change LevyClimate Change and Sustainable Energy Act 2006Composting AssociationContract for differenceDecarbonisation measures in proposed UK electricity market reformEnergy Act 2016Energy certificateEnergy policy of the United KingdomFeed-in tariffFeed-in tariffs in the United KingdomFossil Fuel LevyFuture EnergyGood EnergyGreen AllianceGreen electricity in the United KingdomHydroelectricity in the United KingdomIntelligent Land InvestmentsKronospanList of waste management acronymsMitsubishi Power Systems EuropeNon-Fossil Fuel ObligationPhotovoltaic power stationROROCSRefuse-derived fuelRenewable Energy Certificate (United States)Renewable Energy FoundationRenewable Obligation CertificateRenewable Obligation CertificatesRenewable energy in the United KingdomRenewable portfolio standards in the United StatesRenewables ObligationRenewables Obligation Certificate
Link from a Wikipage to another Wikipage
primaryTopic
Renewables Obligation (United Kingdom)
The Renewables Obligation (RO) is designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. It was introduced in England and Wales and in a different form (the Renewables Obligation (Scotland)) in Scotland in April 2002 and in Northern Ireland in April 2005, replacing the Non-Fossil Fuel Obligation which operated from 1990.
has abstract
The Renewables Obligation (RO) ...... al UK supply to 7.0% in 2010).
@en
Link from a Wikipage to an external page
Wikipage page ID
page length (characters) of wiki page
Wikipage revision ID
994,673,134
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
subject
type
comment
The Renewables Obligation (RO) ...... tion which operated from 1990.
@en
label
Renewables Obligation (United Kingdom)
@en