Stadionul Dinamo (2023)
The New Stadionul Dinamo is a proposed football stadium in Bucharest, Romania. The contract for the feasibility study was signed in September 2020. The works will last between 18 and 24 months. Initially CS Dinamo București handed over to CNI the location of the current velodrome for which the public procurement procedure was started.
Link from a Wikipage to another Wikipage
primaryTopic
Stadionul Dinamo (2023)
The New Stadionul Dinamo is a proposed football stadium in Bucharest, Romania. The contract for the feasibility study was signed in September 2020. The works will last between 18 and 24 months. Initially CS Dinamo București handed over to CNI the location of the current velodrome for which the public procurement procedure was started.
has abstract
The New Stadionul Dinamo is a ...... urement procedure was started.
@en
building start date
2021 (expected)
cost ($)
operator
seating capacity
tenant
Wikipage page ID
65,366,045
page length (characters) of wiki page
Wikipage revision ID
985,431,556
Link from a Wikipage to another Wikipage
broke ground
construction cost
general contractor
CNI
@en
opened
operator
seating capacity
stadium name
Stadionul Dinamo
@en
surface
Grass
@en
tenants
wikiPageUsesTemplate
subject
point
44.45805555555555 26.103055555555557
comment
The New Stadionul Dinamo is a ...... urement procedure was started.
@en
label
Stadionul Dinamo (2023)
@en
sameAs
lat
4.445805555555555e+1
long
2.6103055555555557e+1
wasDerivedFrom
isPrimaryTopicOf
name
Stadionul Dinamo
@en