UTS Central
UTS Central, also known as Building 2, is the building housing the Faculty of Law and UTS Library at the University of Technology Sydney. It is the final building to be opened under the A$1 billion City Campus Master Plan. The building is designed by Francis-Jones Morehen Thorp (FJMT), with elements of an original podium design by Lacoste+Stevenson in association with DJRD. Construction was overseen by head contractor Richard Crookes Constructions. The building is located next to the UTS Tower in Ultimo. It opened in August 2019.
Link from a Wikipage to another Wikipage
primaryTopic
UTS Central
UTS Central, also known as Building 2, is the building housing the Faculty of Law and UTS Library at the University of Technology Sydney. It is the final building to be opened under the A$1 billion City Campus Master Plan. The building is designed by Francis-Jones Morehen Thorp (FJMT), with elements of an original podium design by Lacoste+Stevenson in association with DJRD. Construction was overseen by head contractor Richard Crookes Constructions. The building is located next to the UTS Tower in Ultimo. It opened in August 2019.
has abstract
UTS Central, also known as Bui ...... imo. It opened in August 2019.
@en
address
61 Broadway, Ultimo 2007
@en
alternative name
Building 2
@en
architect
architectural style
building start date
Early 2017
cost ($)
elevator count
floor count
height (μ)
location
status
Link from a Wikipage to an external page
Wikipage page ID
62,233,134
page length (characters) of wiki page
Wikipage revision ID
1,013,108,958
Link from a Wikipage to another Wikipage
alternate names
Building 2
@en
architectural style
architecture firm
building type
cost
A$368.6 million
@en
elevator count
floor area
floor count
height
Location
Ultimo, New South Wales
@en
main contractor
Richard Crookes Construction
@en
name
UTS Central
@en
opened date
August 2019
@en
other designers
Lacoste+Stevenson, DJRD
@en
start date
Early 2017
@en
status
Complete
@en
wikiPageUsesTemplate
subject
comment
UTS Central, also known as Bui ...... imo. It opened in August 2019.
@en
label
UTS Central
@en
sameAs
wasDerivedFrom
isPrimaryTopicOf
name
UTS Central
@en