Zofingen–Wettingen railway line
The Zofingen–Wettingen railway line is a standard-gauge line in Switzerland. It was opened on 6 September 1877 between Zofingen and Baden Oberstadt together with the by the Swiss National Railway (Schweizerische Nationalbahn; SNB). The opening of the adjacent Baden Oberstadt–Wettingen section together with the Wettingen–Effretikon railway, which represented its continuation to the east, was delayed until 15 October 1877 due to construction delays at the Limmat bridge. The SNB went bankrupt in 1878, after which the line was acquired by the Swiss Northeastern Railway (Schweizerische Nordostbahn; NOB) from the bankrupt estate. The NOB became part of the Swiss Federal Railways with the nationalisation of the company in 1902.
serving railway line
Brugg–Hendschiken railway lineHunzenschwil railway stationKölliken Oberdorf railway stationKölliken railway stationKüngoldingen railway stationLenzburg railway stationMenziken–Aarau–Schöftland railway lineOberentfelden railway stationOthmarsingen railway stationRupperswil–Immensee railway lineSafenwil railway stationSuhr railway stationSwiss Central RailwaySwiss National RailwaySwiss Northeastern RailwayWalterswil-Striegel railway stationWettingen–Effretikon railway lineWynental and Suhrental RailwayZofingen-Lenzburg railwayZofingen-Lenzburg railway lineZofingen-Wettingen railwayZofingen-Wettingen railway lineZofingen railway stationZofingen–Lenzburg railwayZofingen–Lenzburg railway lineZofingen–Wettingen railwayZürich–Baden railway line
Link from a Wikipage to another Wikipage
primaryTopic
Zofingen–Wettingen railway line
The Zofingen–Wettingen railway line is a standard-gauge line in Switzerland. It was opened on 6 September 1877 between Zofingen and Baden Oberstadt together with the by the Swiss National Railway (Schweizerische Nationalbahn; SNB). The opening of the adjacent Baden Oberstadt–Wettingen section together with the Wettingen–Effretikon railway, which represented its continuation to the east, was delayed until 15 October 1877 due to construction delays at the Limmat bridge. The SNB went bankrupt in 1878, after which the line was acquired by the Swiss Northeastern Railway (Schweizerische Nordostbahn; NOB) from the bankrupt estate. The NOB became part of the Swiss Federal Railways with the nationalisation of the company in 1902.
has abstract
Die Bahnstrecke Zofingen–Wetti ...... schen Bundesbahnen (SBB) über.
@de
The Zofingen–Wettingen railway ...... sation of the company in 1902.
@en
line length (μ)
Wikipage page ID
59,905,886
page length (characters) of wiki page
Wikipage revision ID
1,017,268,397
Link from a Wikipage to another Wikipage
electrification
linelength km
linenumber
*514 (Zofingen–Lenzburg)
*650.1 (Lenzburg–Mägenwil)
@en
name
Zofingen–Wettingen railway line
@en
native name lang
de
@en
wikiPageUsesTemplate
type
comment
Die Bahnstrecke Zofingen–Wetti ...... schen Bundesbahnen (SBB) über.
@de
The Zofingen–Wettingen railway ...... sation of the company in 1902.
@en
label
Bahnstrecke Zofingen–Wettingen
@de
Zofingen–Wettingen railway line
@en
wasDerivedFrom
isPrimaryTopicOf
name
@en
Zofingen–Wettingen railway line
@en