Construction of the dam commenced in 1963 after the passing of an Act of Parliament ordering its creation to help prevent flooding of the River Severn in winter and to maintain its water levels in the summer. Local opposition was strong against the construction of the reservoir as it would result in the flooding of much of the Clywedog valley and the drowning of 615 acres (2.5 km2) of agricultural land. On top of several disruptions and protests, during construction in 1966 a bomb was detonated within the construction site, setting work back by almost 2 months. The political extremist group Mudiad Amddiffyn Cymru (MAC) was widely suspected of carrying out the bombing.
Wikipage disambiguates
Wikipage redirect
primaryTopic
Clywedog Reservoir
Construction of the dam commenced in 1963 after the passing of an Act of Parliament ordering its creation to help prevent flooding of the River Severn in winter and to maintain its water levels in the summer. Local opposition was strong against the construction of the reservoir as it would result in the flooding of much of the Clywedog valley and the drowning of 615 acres (2.5 km2) of agricultural land. On top of several disruptions and protests, during construction in 1966 a bomb was detonated within the construction site, setting work back by almost 2 months. The political extremist group Mudiad Amddiffyn Cymru (MAC) was widely suspected of carrying out the bombing.
volume (μ³)
has abstract
Construction of the dam commen ...... f the dam under its own power.
@en
area total (m2)
country
inflow
length (μ)
location
maximum depth (μ)
outflow
type
volume (μ³)
Link from a Wikipage to an external page
Wikipage page ID
Wikipage revision ID
729,512,304
Caption
Clywedog Reservoir
subject
hypernym
point
52.486111111111114 -3.625
comment
Construction of the dam commen ...... d of carrying out the bombing.
@en
label
Clywedog Reservoir
@en
lat
5.2486111111111118e+1
long
wasDerivedFrom
depiction
isPrimaryTopicOf
name
Clywedog Reservoir