Fengning Pumped Storage Power Station

The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator is expected to be commissioned in 2019, the last in 2021. Project cost is US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. When complete, it will be the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The power station will operate by shifting water between an upper and lower reservoir to generate electricity. During periods of low energy demand, such

Fengning Pumped Storage Power Station

The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator is expected to be commissioned in 2019, the last in 2021. Project cost is US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. When complete, it will be the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The power station will operate by shifting water between an upper and lower reservoir to generate electricity. During periods of low energy demand, such