Imperial Valley Solar Farm

The Imperial Valley Solar is a 200-megawatt (MW) solar photovoltaic power station located in Imperial County, California, near Calexico. Originally the project was called SES Solar Two, and was to be of Stirling engine design, and the project was approved by California Energy Commission on September 29, 2010. Since then AES Solar has changed the technology from solar thermal to photovoltaic. It has the plant code 56917 with the Department of Energy.

Imperial Valley Solar Farm

The Imperial Valley Solar is a 200-megawatt (MW) solar photovoltaic power station located in Imperial County, California, near Calexico. Originally the project was called SES Solar Two, and was to be of Stirling engine design, and the project was approved by California Energy Commission on September 29, 2010. Since then AES Solar has changed the technology from solar thermal to photovoltaic. It has the plant code 56917 with the Department of Energy.