KTM Komuter Northern Sector
The KTM Komuter Northern Sector (Malay: KTM Komuter Sektor Utara) is one of the four KTM Komuter services run by Malaysian rail operator Keretapi Tanah Melayu. The service was introduced on 11 September 2015 following the completion of the Ipoh-Padang Besar Electrification and Double-Tracking Project in December 2014.
location
serving railway line
Wikipage redirect
lines
primaryTopic
KTM Komuter Northern Sector
The KTM Komuter Northern Sector (Malay: KTM Komuter Sektor Utara) is one of the four KTM Komuter services run by Malaysian rail operator Keretapi Tanah Melayu. The service was introduced on 11 September 2015 following the completion of the Ipoh-Padang Besar Electrification and Double-Tracking Project in December 2014.
has abstract
Die Bahnstrecke Kamunting–Butt ...... tunden von 5:00 bis 20:00 Uhr.
@de
The KTM Komuter Northern Secto ...... n these stations was scrapped.
@en
is part of
line length (μ)
number of stations
opening date
2015-09-11
opening year
operator
railway rolling stock
speed limit (kmh)
status
Operational
thumbnail
type
Link from a Wikipage to an external page
Wikipage page ID
47,822,731
Wikipage revision ID
744,467,672
Caption
KTM Class 83 for KTM Komuter Northern Sector.
depot
electrification
image width
logo width
native name
KTM Komuter Sektor Utara
hypernym
type
comment
Die Bahnstrecke Kamunting–Butt ...... tunden von 5:00 bis 20:00 Uhr.
@de
The KTM Komuter Northern Secto ...... king Project in December 2014.
@en
label
Bahnstrecke Kamunting–Butterworth–Gurun
@de
KTM Komuter Northern Sector
@en
wasDerivedFrom
depiction
homepage
isPrimaryTopicOf
name
KTM Komuter Northern Sector
@en