Dobra Bridge (A1)
The Dobra Bridge is located between Karlovac and Novigrad interchanges of the A1 motorway in Croatia, spanning Dobra River. It is 546 metres (1,791 ft) long, and it comprises four traffic lanes and two emergency lanes. Construction work on the Dobra Bridge started in 1999 and was completed in 2001. Cost of the construction work was 57 million Croatian kuna (7.7 million euro). During the construction there was one major incident: On July 1, 2000, three girders plummeted from the main span piers into the river below. The incident did not cause any injury and damage was reported to be marginal.
Dobra Bridge (A1)
The Dobra Bridge is located between Karlovac and Novigrad interchanges of the A1 motorway in Croatia, spanning Dobra River. It is 546 metres (1,791 ft) long, and it comprises four traffic lanes and two emergency lanes. Construction work on the Dobra Bridge started in 1999 and was completed in 2001. Cost of the construction work was 57 million Croatian kuna (7.7 million euro). During the construction there was one major incident: On July 1, 2000, three girders plummeted from the main span piers into the river below. The incident did not cause any injury and damage was reported to be marginal.
length (km)
has abstract
The Dobra Bridge is located be ...... e was reported to be marginal.
@en
Мост над Доброй (хорв. Most Do ...... и A1 (Загреб — Задар — Сплит).
@ru
bridge carries
A1 motorway
length (μ)
located in area
mainspan (μ)
maintained by
opening year
thumbnail
Link from a Wikipage to an external page
Wikipage page ID
28,825,857
Wikipage revision ID
642,289,610
toll
charged as a part of A1 motorway toll
width
subject
point
45.504903 15.460167
type
comment
The Dobra Bridge is located be ...... e was reported to be marginal.
@en
Мост над Доброй (хорв. Most Do ...... и A1 (Загреб — Задар — Сплит).
@ru
label
Dobra Bridge (A1)
@en
Мост над Доброй
@ru
lat
4.5504903e+1
long
1.5460167e+1
wasDerivedFrom
isPrimaryTopicOf
name
Dobra Bridge
@en
Most Dobra
@en