Dundas Street BRT

Dundas Street Bus Rapid Transit (BRT) is a bus rapid transit corridor proposed by Metrolinx through the regional transportation plan The Big Move. The Dundas Street BRT would be a major east-west corridor for the Greater Toronto and Hamilton Area, extending 40 kilometres (25 miles) along Dundas Street from the west terminus of Line 2 Bloor-Danforth in Toronto to Brant Street in Burlington. It would also make connections with the proposed Hurontario-Main LRT and GO Transit's Milton line. The estimated capital cost is $600 million.

Dundas Street BRT

Dundas Street Bus Rapid Transit (BRT) is a bus rapid transit corridor proposed by Metrolinx through the regional transportation plan The Big Move. The Dundas Street BRT would be a major east-west corridor for the Greater Toronto and Hamilton Area, extending 40 kilometres (25 miles) along Dundas Street from the west terminus of Line 2 Bloor-Danforth in Toronto to Brant Street in Burlington. It would also make connections with the proposed Hurontario-Main LRT and GO Transit's Milton line. The estimated capital cost is $600 million.