Kysinga Hydroelectric Power Station

The Kysinga Hydroelectric Power Station (Norwegian: Kysinga kraftverk) is a hydroelectric power station in the municipality of Rindal in Møre og Romsdal county, Norway. It is a run-of-river hydro power station utilizing a drop of 135 meters (443 ft) on a tributary of the Surna River. Permission was granted for construction in 2009 and the plant came into operation in 2010. It is operated by Kysinga Kraft AS. It operates at an installed capacity of 1.25 MW, with an average annual production of about 6.5 GWh.

Kysinga Hydroelectric Power Station

The Kysinga Hydroelectric Power Station (Norwegian: Kysinga kraftverk) is a hydroelectric power station in the municipality of Rindal in Møre og Romsdal county, Norway. It is a run-of-river hydro power station utilizing a drop of 135 meters (443 ft) on a tributary of the Surna River. Permission was granted for construction in 2009 and the plant came into operation in 2010. It is operated by Kysinga Kraft AS. It operates at an installed capacity of 1.25 MW, with an average annual production of about 6.5 GWh.