Taishan Nuclear Power Plant

Two units at the Taishan Nuclear Power Plant (Chinese: 台山核电站; pinyin: Táishān Hédiànzhàn) are under construction in Chixizhen, Taishan, Guangdong province, China.It was planned to go online in 2013 and will be the third site to house Areva's 1,750 megawatt (MW) European Pressurized Reactor (EPR) units.The project is owned by Guangdong Taishan Nuclear Power Joint Venture Company Limited (TNPC), a joint venture, which is 70% owned by China Guangdong Nuclear Power Group (CGNPC) and 30% by Électricité de France (EDF).

Taishan Nuclear Power Plant

Two units at the Taishan Nuclear Power Plant (Chinese: 台山核电站; pinyin: Táishān Hédiànzhàn) are under construction in Chixizhen, Taishan, Guangdong province, China.It was planned to go online in 2013 and will be the third site to house Areva's 1,750 megawatt (MW) European Pressurized Reactor (EPR) units.The project is owned by Guangdong Taishan Nuclear Power Joint Venture Company Limited (TNPC), a joint venture, which is 70% owned by China Guangdong Nuclear Power Group (CGNPC) and 30% by Électricité de France (EDF).