Wendlingen–Ulm high-speed railway

Wendlingen-Ulm high-speed line is a proposed high-speed railway line crossing the Swabian Alb with speeds of up to 250 km/h and will run in many sections parallel to the A 8. In the east the line will connect with the Neu-Ulm station opened on 18 March 2007, in the west to the Stuttgart 21 project.

Wendlingen–Ulm high-speed railway

Wendlingen-Ulm high-speed line is a proposed high-speed railway line crossing the Swabian Alb with speeds of up to 250 km/h and will run in many sections parallel to the A 8. In the east the line will connect with the Neu-Ulm station opened on 18 March 2007, in the west to the Stuttgart 21 project.