Yabog pipeline
Yabog (Yacimientos-Bolivian Gulf) pipeline is a 441 kilometres (274 mi) long natural gas pipeline, which connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. The pipeline was commissioned in 1972.
Wikipage redirect
primaryTopic
Yabog pipeline
Yabog (Yacimientos-Bolivian Gulf) pipeline is a 441 kilometres (274 mi) long natural gas pipeline, which connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. The pipeline was commissioned in 1972.
has abstract
Yabog (Yacimientos-Bolivian Gu ...... line was commissioned in 1972.
@en
Wikipage page ID
11,191,258
Wikipage revision ID
517,714,513
discharge
6,200,000,000
finish
Campo Duran in Salta Province, Argentina
length km
map caption
Location of Yabog pipeline
name
Yabog pipeline
operator
Transredes, Transportadora de Gas del Norte
partners
YPFB, TecGas NV, Compañía General de Combustibles S.A., Total S.A., Petronas
start
Río Grande in Santa Cruz de la Sierra, Bolivia
type
subject
comment
Yabog (Yacimientos-Bolivian Gu ...... line was commissioned in 1972.
@en
label
Yabog pipeline
@en