Clem Jones Tunnel
The M7 Clem Jones Tunnel (CLEM7), known during its development as the North-South Bypass Tunnel (NSBT), is a A$3.2 billion motorway grade toll road under the Brisbane River, between Woolloongabba and Bowen Hills in Brisbane, Queensland. The tunnel was progressively opened to traffic from late on 15 March 2010 until just after midnight on 16 March 2010. It was completely open by 12:02 am.
product
service
primaryTopic
Clem Jones Tunnel
The M7 Clem Jones Tunnel (CLEM7), known during its development as the North-South Bypass Tunnel (NSBT), is a A$3.2 billion motorway grade toll road under the Brisbane River, between Woolloongabba and Bowen Hills in Brisbane, Queensland. The tunnel was progressively opened to traffic from late on 15 March 2010 until just after midnight on 16 March 2010. It was completely open by 12:02 am.
length (km)
has abstract
The M7 Clem Jones Tunnel (CLEM ...... nages and operates the tunnel.
@en
is part of (literal)
length (μ)
location
number of lanes
opening date
2010-03-15
opening year
operator
route start location
speed limit (kmh)
status
toll ($)
vehicles per day
Link from a Wikipage to an external page
Wikipage page ID
Wikipage revision ID
738,272,418
Caption
Tunnel, under the Brisbane River, during the Clem7 Community Open Day
Character
image size
startwork
September 2006
traffic
subject
point
-27.463438888888888 153.03536111111111
type
comment
The M7 Clem Jones Tunnel (CLEM ...... s completely open by 12:02 am.
@en
label
Clem Jones Tunnel
@en
lat
-2.7463438888888887e+1
long
1.5303536111111111e+2
wasDerivedFrom
homepage
isPrimaryTopicOf
name
( North–South Bypass Tunnel )
@en
Clem Jones Tunnel (CLEM7)
@en