GN W-1
The W-1 was a class of electric locomotive built by the Great Northern Railway. They were constructed to haul trains on the 73-mile (117 km) electrified portion of the railroad across the Cascade Mountains from Wenatchee, Washington to Skykomish, Washington, including the Cascade Tunnel. Only two locomotives were built, and they had an AAR B-D+D-B wheel arrangements.
primaryTopic
GN W-1
The W-1 was a class of electric locomotive built by the Great Northern Railway. They were constructed to haul trains on the 73-mile (117 km) electrified portion of the railroad across the Cascade Mountains from Wenatchee, Washington to Skykomish, Washington, including the Cascade Tunnel. Only two locomotives were built, and they had an AAR B-D+D-B wheel arrangements.
height (mm)
length (mm)
has abstract
Die Klasse W-1 der Great North ...... Nordamerika eingesetzt wurden.
@de
The W-1 was a class of electri ...... rbine-electric locomotive #80.
@en
active years end year
active years start year
builder
height (μ)
length (μ)
3.07848e+1
number built
Link from a Wikipage to an external page
Wikipage page ID
22,194,269
Wikipage revision ID
708,506,349
aarwheels
collectionmethod
deliverydate
disposition
electricsystem
fleetnumbers
50,185,019
locobrakes
Air/Regenerative
numinclass
operator
Great Northern Railway
operatorclass
powertype
retiredate
scrapdate
19,681,959
serialnumber
2,844,828,449
tractionmotors
trainbrakes
trainheating
transmission
AC Synchronous motors ,
DC Generators ,
DC traction motors
whytetype
subject
hypernym
comment
Die Klasse W-1 der Great North ...... Nordamerika eingesetzt wurden.
@de
The W-1 was a class of electri ...... AR B-D+D-B wheel arrangements.
@en
label
GN W-1
@en
GN-Klasse W1
@de
wasDerivedFrom
isPrimaryTopicOf
name
Great Northern W-1
@en