Narude Dam
The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream.
primaryTopic
Narude Dam
The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream.
length (km)
has abstract
The Narude Dam is a gravity da ...... the sixth furthest downstream.
@en
成出ダム(なるでダム)は、岐阜県大野郡白川村と富山県南砺市と ...... に送水し、合計最大9万3,200キロワットの電力を発生する。
@ja
building start date
building start year
country
description
Gravity
@en
height (μ)
vastest lake
length (μ)
location
opening year
purpose
thumbnail
volume (μ³)
Wikipage page ID
40,004,358
Wikipage revision ID
691,308,572
coordinates display
coordinates type
image caption
Downstream face
lat s
location map
long s
plant capacity
plant commission
plant hydraulic head
plant operator
Kansai Electric Power Co., Inc.
plant turbines
New: 1 x 60 MW Francis-type
Original: 2 x 18.5 MW Francis-type
spillway type
Crest overflow, 8 tainter gates
subject
point
36.35008611111111 136.8749222222222
comment
The Narude Dam is a gravity da ...... the sixth furthest downstream.
@en
成出ダム(なるでダム)は、岐阜県大野郡白川村と富山県南砺市と ...... に送水し、合計最大9万3,200キロワットの電力を発生する。
@ja
label
Narude Dam
@en
成出ダム
@ja
lat
3.635008611111111e+1
long
1.368749222222222e+2
wasDerivedFrom
isPrimaryTopicOf
name
Narude Dam
@en