Risk assessment, risk management and risk-based monitoring following a reported accidental release of poliovirus in Belgium, September to November 2014.
about
Response to a wild poliovirus type 2 (WPV2)-shedding event following accidental exposure to WPV2, the Netherlands, April 2017.Insights from a Systematic Search for Information on Designs, Costs, and Effectiveness of Poliovirus Environmental Surveillance Systems.Polio and Measles Down the Drain: Environmental Enterovirus Surveillance in the Netherlands, 2005 to 2015.Community transmission of type 2 poliovirus after cessation of trivalent oral polio vaccine in Bangladesh: an open-label cluster-randomised trial and modelling study.Diagnostic Assay Development for Poliovirus Eradication.Assessing the stability of polio eradication after the withdrawal of oral polio vaccine.
P2860
Risk assessment, risk management and risk-based monitoring following a reported accidental release of poliovirus in Belgium, September to November 2014.
description
2016 nî lūn-bûn
@nan
2016年の論文
@ja
2016年学术文章
@wuu
2016年学术文章
@zh-cn
2016年学术文章
@zh-hans
2016年学术文章
@zh-my
2016年学术文章
@zh-sg
2016年學術文章
@yue
2016年學術文章
@zh
2016年學術文章
@zh-hant
name
Risk assessment, risk manageme ...... m, September to November 2014.
@en
Risk assessment, risk manageme ...... m, September to November 2014.
@nl
type
label
Risk assessment, risk manageme ...... m, September to November 2014.
@en
Risk assessment, risk manageme ...... m, September to November 2014.
@nl
prefLabel
Risk assessment, risk manageme ...... m, September to November 2014.
@en
Risk assessment, risk manageme ...... m, September to November 2014.
@nl
P2860
P1433
P1476
Risk assessment, risk manageme ...... m, September to November 2014.
@en
P2093
Jack Schijven
Saskia Rutjes
P2860
P356
10.2807/1560-7917.ES.2016.21.11.30169
P577
2016-03-01T00:00:00Z