Line 3 (Kunming Metro)
Line 3 is a rapid transit line on the Kunming Metro, serving the city of Kunming, China. It links Line 2 at , and links Line 6 at East Coach Station. It is an east-west line of the system. Phase I has a total length of 19.16 km (11.91 mi) and 17 stations. It opened in August 2017 along with Line 6.
Wikipage disambiguates
primaryTopic
Line 3 (Kunming Metro)
Line 3 is a rapid transit line on the Kunming Metro, serving the city of Kunming, China. It links Line 2 at , and links Line 6 at East Coach Station. It is an east-west line of the system. Phase I has a total length of 19.16 km (11.91 mi) and 17 stations. It opened in August 2017 along with Line 6.
has abstract
Line 3 is a rapid transit line ...... August 2017 along with Line 6.
@en
line length (μ)
number of stations
opening date
2017-08-29
opening year
status
Operational
type
Wikipage page ID
50,623,693
page length (characters) of wiki page
Wikipage revision ID
1,013,589,626
Link from a Wikipage to another Wikipage
caption
Train of Line 3 leaving East Coach Station
@en
Character
Underground and elevated
@en
name
Kunming Metro Line 3
@en
open
2017-08-29
operator
Kunming Rail Transit Corporation
@en
stations
status
Operational
@en
type
wikiPageUsesTemplate
subject
type
comment
Line 3 is a rapid transit line ...... August 2017 along with Line 6.
@en
label
Line 3 (Kunming Metro)
@en
sameAs
wasDerivedFrom
isPrimaryTopicOf
name
Kunming Metro Line 3
@en