List of Manchester Metrolink tram stops
Since opening in 1992, the Manchester Metrolink light-rail/tram system has grown to a network of 99 tram stops. The system opened in April 1992 with 20 tram stops with routes radiating from Manchester Victoria to Bury and Manchester Piccadilly to Altrincham. Phase 2 extended the network to Eccles with 12 new tram stops and a new interchange at Cornbrook was built in 1999. Phase 3a involved the construction of 36 new stops and new lines to Rochdale via Oldham, Tameside and East Didsbury. The first stops as part of Phase 3a opened in 2011 and the final stop opened in 2014. A new 9 miles (14 km) line to Manchester Airport became operational in November 2014 – 12 months ahead of schedule.
Wikipage disambiguates
Wikipage redirect
Link from a Wikipage to another Wikipage
seeAlso
primaryTopic
List of Manchester Metrolink tram stops
Since opening in 1992, the Manchester Metrolink light-rail/tram system has grown to a network of 99 tram stops. The system opened in April 1992 with 20 tram stops with routes radiating from Manchester Victoria to Bury and Manchester Piccadilly to Altrincham. Phase 2 extended the network to Eccles with 12 new tram stops and a new interchange at Cornbrook was built in 1999. Phase 3a involved the construction of 36 new stops and new lines to Rochdale via Oldham, Tameside and East Didsbury. The first stops as part of Phase 3a opened in 2011 and the final stop opened in 2014. A new 9 miles (14 km) line to Manchester Airport became operational in November 2014 – 12 months ahead of schedule.
has abstract
Since opening in 1992, the Man ...... om East Didsbury to Stockport.
@en
Wikipage page ID
31,686,020
page length (characters) of wiki page
Wikipage revision ID
1,014,213,860
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
comment
Since opening in 1992, the Man ...... – 12 months ahead of schedule.
@en
label
List of Manchester Metrolink tram stops
@en